|   
Show categories
Need Advice? Call Us Now 01 6426600 or
Request A Call Back
or
Email Us

Showing all 3 results

  • Kingspan TR27

    REF:
    Thermaroof TR27 LPC/FM is a high performance insulation core for flat roofs waterproofed with fully adhered single–ply, partially bonded built–up felt, mastic asphalt and cold liquid applied waterproofing.
    REF:

    Description

    Thermaroof TR27 LPC/FM is a high performance insulation core for flat roofs waterproofed with fully adhered single–ply, partially bonded built–up felt, mastic asphalt and cold liquid applied waterproofing.

    What the experts have to say

    Green Guide
    Rating
    An Ecoprofile, certified by BRE Certification to the 2008 BRE Environmental Profiles Methodology, has been created for Kingspan Thermaroof ® TR27 LPC/FM produced at Kingspan Insulation’s British manufacturing facilities. The BRE has assigned the product a 2008 Green Guide Summary Rating of A.
  • Xtratherm FR MG

    REF:
    Xtratherm FR/MG is a high performance insulation board suitable for use below single ply fully adhered roof membranes, single ply waterproofing systems and partially bonded built-up felt
    REF:

    Description

    Xtratherm FR/MG is a high performance insulation board suitable for use below single ply fully adhered roof membranes, single ply waterproofing systems and partially bonded built-up felt.

    What the experts have to say

    Fully Adhered
    Systems
    Xtratherm FR/MG is suitable for use with most fully adhered single–ply waterproofing membranes. Board joints and abutments should be taped subject to the approved adhesive system being used. A fleeced backed membrane might be required with the system being used, check with the system manufacturer.
  • ROOFING PREMIUM SERVICE

    REF:
    ROOFING PREMIUM SERVICE
    REF:

    Description

      Initial Roof Survey including thermal imaging Report on findings, proposal and product specification On site visits with site inspection reports Final sign off Insurance backed warranties for material and labour upon completion by an approved certified installer CPD Presentations On site installation training / Supervision CONTACT US TODAY!
   |   

Questions? Please contact us

Or submit our contact form